A typical installation will take less than 30 minutes per meter and will cause no disruption to supply.
Our device is installed onto the existing meter. We connect a pulse unit to the pulsed output and the meter is not replaced.
No.
There is no need to shut off supply while our Engineers install our technology to your meter.
A typical installation will take less than 30 minutes per meter and will cause no disruption to supply.
Our device is installed onto the existing meter. We connect a pulse unit to the pulsed output and the meter is not replaced.
Recent Comments